
Across Review
The clearest statement of a bridge's security assumption
of 10
Across scores 7.2/10 in bridges: it states its optimistic security assumption in plain terms and links eight OpenZeppelin audit reports. Its fees are a formula with no published rates, and the code is under BUSL until 2027. Based on desk research of its docs on 6 November 2026.
Trust model
Bonded bundles on Ethereum, disputable via UMA's Optimistic Oracle
Fees
Input minus output: LP + relayer fee, optional app fee; no rates published
Licence
BUSL-1.1, converting to GPL-3.0-or-later by 27 Jul 2027
Chains
26+ stated in the docs
Audits
8 linked OpenZeppelin reports, undated; bug bounty up to $1,000,000
Score arithmetic
(5 + 10 + 4 + 9 + 8) / 5 = 7.2
Scores
Each criterion carries equal weight. The overall score is the average of these 5 scores — (5.0 + 10.0 + 4.0 + 9.0 + 8.0) ÷ 5 = 7.2.
Pros
- Trust model disclosure 10: bonded bundles, UMA oracle disputes, one honest disputer suffices
- Chain coverage 9: 26+ chains stated, including Ethereum, major L2s, Solana and Tron
- Audit disclosure 8: eight linked OpenZeppelin reports, covering Across V2, V3 and UMA
- Fee components explained, including when the LP fee falls to zero
Cons
- Fee transparency 5: no fixed rate; LP curve parameters vary by route and are not listed
- Licence & code openness 4: BUSL-1.1 until 27 July 2027, not an open-source licence today
- Audit page shows no dates and names the firm only through its report links
Across scores 7.2 out of 10 in our bridge ratings, down from 7.4 in July and sixth of nine. It earns its marks for the plainest statement of a security assumption in the category and a linked audit archive. It loses them on two points: cost is never published as a rate, and the core contracts are still under a source-available licence rather than an open-source one.
This assessment is desk research from Across's documentation, contract repository and terms, rechecked on 6 November 2026. We did not bridge funds through Across, and nothing here measures transfer speed or price in practice.
How Across scores in bridges
The bridges category uses five criteria, each worth 20%. One mark moved on this check.
| Criterion | Finding (Nov 2026) | Mark |
|---|---|---|
| Fee transparency | Fee defined as input minus output; LP, relayer and app components explained, LP curve parameters not published | 5 |
| Trust model disclosure | Bonded bundles on Ethereum, accepted unless disputed through UMA's Optimistic Oracle; one honest disputer suffices | 10 |
| Licence & code openness | Business Source License 1.1, converting to GPL-3.0-or-later by 27 July 2027 | 4 |
| Chain coverage | 26+ chains stated, including Ethereum, major L2s, Solana and Tron | 9 |
| Audit disclosure | Eight linked OpenZeppelin reports covering Across V2, V3, the token and UMA components; no dates shown | 8 |
Arithmetic: (5 + 10 + 4 + 9 + 8) / 5 = 36 / 5 = 7.2.
What changed: Fee transparency moved from 6 to 5. The fee documentation itself has not changed; the category now applies one scale to fees, and a fee explained as components without any published rate scores 5, as it does for Axelar and Stargate. The stated chain count is now "26+" on the documentation overview, where the July review recorded 28; that is still broad coverage against the category standard, so the mark stays at 9.
Strongest criteria: trust model and coverage
Trust model disclosure (10)
Across says exactly what a user relies on. Relayers pay users on the destination chain from their own capital. Roughly every 1.5 hours an off-chain dataworker groups deposits and fills into a bundle and proposes it to the HubPool contract on Ethereum with a bond. The bundle is accepted unless someone disputes it within a challenge window, and disputes are resolved through UMA's Optimistic Oracle. The documentation states that a single honest actor is enough to reject an invalid bundle.
That description names the component (UMA's oracle), the economic deterrent (the bond), and the condition under which it would fail (no one disputes a bad bundle). This is the standard the criterion exists to reward, and it is why Across takes the full mark. The design is the same "valid unless challenged" logic used by optimistic rollups.
Chain coverage (9)
The documentation claims support for 26 or more chains. The homepage lists Ethereum, Arbitrum, Optimism, Base, Polygon, zkSync, Linea, BNB Smart Chain, Avalanche, Solana, Tron and HyperCore among them. The count is Across's own figure, and we did not test routes on each network.
Audit disclosure (8)
The audits page links eight reports, all hosted on OpenZeppelin's blog: two for Across V3, one for V2, one for the token and token distributor, and four for UMA, including its continuous audit of the Optimistic Oracle. Because Across depends on that oracle, the UMA reports are relevant rather than padding. The page does not show dates and does not name the firm in its own text; the firm is clear from the report links. Those gaps, and a single audit firm, keep the mark below the 10 the category gives a multi-firm archive such as Axelar's. A separate bug bounty offers up to $1,000,000 for critical findings, which the score notes but does not count as an audit.
Weakest criteria: fees and licence
Fee transparency (5): a formula, not a rate
The fee documentation defines the total fee as the input amount minus the output amount. It explains three parts. The LP fee follows a utilization-based curve and is zero when the relayer is repaid on the origin chain. The relayer fee covers destination gas, the cost of capital locked for about 1.5 hours, and risks such as reorganizations. An optional app fee is set by integrators as a decimal from 0 to 1.
What is missing is any number. The page says the LP curve parameters "vary by token and route" without listing them, and tells integrators not to cache fee responses. A user can see the cost only at quote time. That is a real deficiency against this criterion, not an unmeasured one: the structure is explained well, but nothing can be compared before quoting. For how fee types differ in general, see our guide to trading fees, spreads and gas.
Licence & code openness (4)
The contracts repository carries the Business Source License 1.1, with Risk Labs as licensor, converting to GPL v3.0 or later by 27 July 2027. The code is public and readable, but the licence restricts production use by others until then. The category marks source-available code with a future change date at 4, well below the 9 to 10 given to Apache or GPL licences. If the conversion happens on schedule, this mark is expected to rise at a later check.
What the score does not cover
- Actual cost and speed. Across claims fills in under two seconds; we did not measure fills or compare quotes.
- Relayer liveness. If no relayer fills a deposit, delivery is delayed. The rubric does not score this.
- Governance and ownership. Across's forum announced on 17 September 2026 that the protocol had been transferred to a US company, Across, Inc., with ACX holders offered USDC or equity until 8 January 2027. None of the five criteria measures operator structure, so the move did not change any mark. Holders should use only the portal linked from official channels.
- Incident history. The homepage states "no user funds lost"; that is the company's claim, and it is not scored.
Across vs Axelar and Chainflip
On current category marks, Axelar is first of nine at 8.6, Chainflip fifth at 7.6 and Across sixth at 7.2. Axelar's lead over Across comes from its Apache 2.0 licence (10 against 4) and a larger, dated audit archive (10 against 8); the two are level on fees at 5 and on chain coverage at 9, and Across is a point ahead on trust model disclosure. Against Chainflip, Across wins on chain coverage (9 against 5) and audits (8 against 4) and loses on fees (5 against 9) and licence (4 against 10). The bridge ratings page shows the live order.
Who it suits
Across's marks favor a user who wants to understand the security assumption before sending funds, and who is willing to read the output amount at quote time instead of comparing a published rate. Developers who need a permissively licensed codebase to build on today will find the BUSL terms a constraint until 2027. For the general risks of moving assets between chains, our explainer on how bridges work and why they are risky is the place to start. This rating is not a recommendation to use any bridge.
How it compares

Axelar
Open-source code and the deepest dated audit archive among bridges

Wormhole
A numbered guardian quorum and a deep, named audit record

Celer cBridge
Open-source contracts with a stated fee range and threshold

deBridge
Per-chain flat fees and a dated audit archive

Chainflip
Native-asset swaps with a published custody threshold and fee table

Stargate / LayerZero
Broad chain list and named audits at every protocol stage

Squid
Named, linked audits and wide chain coverage for routed swaps

Synapse
MIT-licensed code and a documented optimistic relay network
Sources
Scored from published primary sources rather than hands-on use. Every figure above comes from one of the pages below, on the date shown. Manufacturers change prices and specifications without notice — if something here no longer matches the source, tell us and we will correct it.
- 1.Across docs — fees — checked
- 2.Across docs — intents architecture and optimistic verification — checked
- 3.Across docs — audits — checked
- 4.Across docs — overview (chain count) — checked
- 5.Across docs — bug bounty — checked
- 6.Across contracts — LICENSE (BUSL-1.1) — checked
- 7.Across — homepage — checked
- 8.Across forum — token buyout portal announcement (17 Sep 2026) — checked
Frequently asked questions
Why does Across score 7.2 out of 10?
It earns 10 for trust model disclosure, 9 for chain coverage, 8 for audit disclosure, 5 for fee transparency and 4 for its licence. The marks total 36, and 36 divided by 5 is 7.2.
What holds the Across score back?
Two things. Its fees are explained as components with no published rates, so cost is known only at quote time, and its contracts are under the Business Source License until 27 July 2027.
Did anything change since the last review?
One mark moved on the 6 November 2026 check: fee transparency went from 6 to 5, so that a fee explained only as components scores the same across all bridges. The stated chain count is now 26+ rather than 28, which still fits a 9. The protocol's transfer to Across, Inc. is not something the bridge criteria measure.
Was Across tested hands-on?
No. The basis is desk research of Across's documentation, contract licence, audit page and terms. Transfer speed and actual quotes were not measured.
How does Across compare with Axelar and Chainflip?
Axelar scores 8.6, ahead on licence and audit depth. Chainflip scores 7.6 and Across 7.2; Across is stronger on chain coverage and audits, Chainflip on fees and licence.
Nothing here is financial advice. Editorial policy · How we score · How we're funded.